TaskPalleting up to 20,000 randomly placed indexable inserts in a very small area as well as workpiece-aligned loading and unloading of a Junker grinding machine. Cycle time: 20 sec. Workpiece exchange time in the machine: 4.0 sec. Workpiece weight: approx. 0.03 kg – 0.20 kg Workpiece dimensions: approx. Ø 5.0 mm - Ø 25.0 mm to approx. 10.0 mm – 35.0 mm SolutionPalleting system with integrated KUKA six-axis industrial robot and a high definition camera system for recognition of the shape and position of the indexable inserts. The workpieces are loaded and unloaded by means of a GÜDEL ZP-1 dual-axis portal integrated in the machine, optional suction, magnetic or mechanical gripper technology. Scope of supplyGÜDEL standard palleting cell with unfinished / finished part delivery KUKA KR 3 industrial robot incl. KRC2 standard control Camera system Blower box for cleaning finished parts SPC rack for manual parts inspection NIO parts removal Gripper system with magnet technology Transfer unit for hand-over of unfinished / finished parts by the robot to the integrated loading portal Toothed rack- and pinion–driven GÜDEL ZP-1 two-axis portal ResultSize of the supplied palleting cell including periphery only 1,500 mm x 1,500 mm. |